Technology Innovation Leaders Class
Business performance
Performance is the achievement guaranteed followed by the excellent technology and   abundant experience.
Winning the contract for the Singapore’s “Assessing the residual life of EMU and proposing solution to extend the service life” project is the case that shows technology status of TILC which is a result that TILC’s technological prowess and experience are fairly evaluated.
- Project : Analyzed defect for vehicle part for Uijeongbu LRV
- Client : PARSONS BRINCKERHOFF
- Year : Dec. 2014
- Project : Analyzed behavioral characteristic of HSR(300km/h) and intercity EMU(180Km/h)
- Client : Korea Railroad Research Institute(KRRI)
- Year : Feb. 2015
- Project : Researched and developed wheel axle and wheel for caterpillar type fire engine
- Client : Hongin(End user : KRRI)
- Year : Apr. 2015
- Project : Design of circuit & wiring and table supply for Shunting car of Taiwan and Incheon
- Client : Shinsung system
- Year : Jun. 2015
- Project : Renovated the design of the Korail Mugunghwa passenger train and supplied cable, copper pipe and parts related to the renovation
- Client : ADS Rail(Korail)
- Year : Sep. 2015
- Project : Valuated asset for the EMU’s(KHI, KNS, SIE, KSF) for Singapore SMRT
- Client : PARSONS BRINCKERHOFF(End User : SMRT)
- Year : Dec. 2015
- Project : Disassembled, replaced and assembled guidance frame for Uijeongbu LRV
- Client : Uijeongbu LRT Co., Ltd
- Year : Feb. 2016
- Project :Assessed residual life(existing vehicle) and proposed method to extend life for the carbody, bogie and center pivot for Singapore EMU
- Client : PARSONS BRINCKERHOFF(End User SMRT/SRE)
- Year : Apr.2016
- Project : Axle develop and supply for High Speed Railway(KTX)
- Client : Bearing art Co., Ltd
- Year : Oct. 2016
- Project : Axle(M, T) develop and supply for EMU
- Client : WJIS Co., Ltd
- Year : Oct. 2016
- Project : PSD limit switch install and improvment
- Client : Uijeongbu LRT Co., Ltd / GS ENC
- Year : Nov. 2016
- Project : Uijeongbu Inverter fitting and component raplasment
- Client : Uijeongbu LRT Co., LRT
- Year : Nov. 2016
- Project : Ring forging develop and supply(Defense)
- Client : Doosung Tech. Co., Ltd
- Year : Nov. 2016
- Project : Accumulator development and supply
- Client : Incheon Transit Corporation
- Year : Apr. 2017
- Project : Precise Diagnosis Assessment plan on EMU with reverse and zero camber
- Client : WSP(End user : Singapore SMRT)
- Year : Jun. 2017
- Project : Developed and supplied vacuum pump for Myanmar Railway
- Client : Myanmar Railway
- Year : Aug. 2017
- Project : Precision safety diagnosis of CDC
- Client : KRE&C(End user : Korail)
- Year : Oct. 2017
- Project : Acoustic absorbent and sound insulation material for soung control
- Client : Bokuk
- Year : Jan. 2018
- Project : Development and supply of ramp/step for electric buses
- Client : Hwangsung
- Year : Jan. 2018
- Project : Emergency handle wire for EMU electric door
- Client : ADS-Rail
- Year : Mar. 2018
- Project : Developed and supplied tap sheet, Roller and shaft
- Client : Intercon system
- Year : Mar. 2018
- Project : Developed and supplied door rail and lead screw for A-quasi-high speed train
- Client : Intercon system
- Year : Apr. 2018
- Project : Developed and supplied bottom cross frame for A quasi-high- speed train
- Client : Intercon system
- Year : May. 2018
- Project : supplied aluminum honeycomb core
- Client : Kirin and ADS-Rail
- Year : May. 2018
- Project : Sensor research & development service of KAERI
- Client : KAERI(Korea Atomic Energy Research Institute)
- Year : Jun. 2018
- Project : Test data analysis of vehicle running
stability and ride comfort test - Client : Sampyo Railway
- Year : Jun. 2018
- Project : Calculation of axle and wheel strength for bogie type approval
- Client : Hanyoo System
- Year : Jun. 2018
- Project : Tram advancement project of KRRI (vehicle weight measurement)
- Client : GM Tech.
- Year : Sep. 2018
- Project : Driving safety and ride comfort measurement for high speed track (Seoul Gangneung)
- Client : KRRI
- Year : Oct. 2018
- Project : Bogie design, analysis & performance test for Seoul line#4 EMU
- Client : T/E&C
- Year : Nov. 2018
- Project : Wind and shock protection of Locomotive
- Client : Shanghai and Guangzhou Railway Bureau
- Year : 2018 ~ 2020